A resin liner cured inside the existing drain, sealing every joint. And because it can be done in sections, it is often the only version of this repair a small block can actually fund.
Online Now!·--:--
Relining is normally sold on being tidy. No trench, no mess, done in a day. In a six-pack there is a far more useful argument, and it is a financial one.
A liner can be installed in sections. The worst run this financial year, the next one after the following budget, each stage a finished piece of work in its own right rather than half a job left hanging.
Excavation cannot be divided that way. Once a trench is open it has to be completed, so the whole cost lands in one levy. For a scheme of six owners with no meaningful sinking fund, that is frequently the difference between a repair happening and not happening.
So our quote sets out the full job, the staged version, and what deferring a year costs in continued clearing and added risk. Three numbers, so the committee is choosing rather than just being told what it cannot afford.


Ask which section is actually worst, and what it would cost to do that part first. In a small scheme that question is often the whole answer.
A shared line is common property, so the cost divides across the lots. In a six-pack that is a special levy per owner rather than a sinking fund drawdown.
Any recommendation that does not engage with that simply will not be actioned, however correct it is about the pipework.
A liner can be installed run by run, each one a complete repair. An open trench has to be finished before anyone goes home.
That single difference is often what makes the job possible at all for a small scheme.
Continued clearing at the current frequency, the risk of an emergency at emergency rates, and the chance a section degrades past what lining can fix.
Deferring is a legitimate decision. It should just be made with those numbers in front of the meeting rather than by default.
A liner needs enough sound pipe to press against. A collapsed or crushed run has to be excavated and replaced instead.
Which is why waiting is not cost-free: it can convert an affordable reline into a much dearer excavation.
A written scope, a fixed figure, staged options, and the cost of doing nothing. That is what can actually be put to a vote.
We provide all four with the inspection. A verbal recommendation, however good, dies at the first meeting.
Quoted at a fixed price off the camera footage. These are indicative 2026 ranges. Staged options and the cost of deferring are included in the written scope at no extra charge.
Footage handed over. Credited against the reline if the scheme proceeds.
One failed joint or a short run. Frequently the affordable first stage.
Priced on length, diameter and how many bends are in it.
Old pipework taken back to clean wall so the liner forms properly.
The four things a committee needs in order to vote on any of it.

We film the line and hand over the footage before anyone quotes. The committee has to see it, not hear about it.

The full job, the staged version, and what deferring a year costs. So the meeting is choosing between options.

Through existing access, no common area excavated, and the outage window given in advance for the noticeboard.

The finished run recorded end to end so the owners can see exactly what they funded.
In a building this age that pattern is usually the pipe rather than the people. A camera will show which, and give the committee something it can actually act on.
Call 1300 381 569
A resin-soaked liner is drawn through the existing drain, inflated so it presses against the pipe wall along the whole length, then cured until it hardens. What results is a continuous pipe formed inside the old one with no joints along the lined section. Joints are where roots enter and where corrosion opens gaps, so removing them is the point. The old pipe stays put and becomes the mould, so nothing has to be dug up.
Usually not, and this is the most useful thing about lining for a small block. It can be done in sections. The worst run this financial year, the next one after the following budget, with each stage a complete piece of work rather than half a job left open. Excavation does not divide that way: once a trench is open it has to be finished. A committee that cannot approve $7,000 can often approve $2,500 twice, and nobody offers them that because it takes longer to write up.
That is exactly the right question and it should be in every quote you receive. Deferring has a price: continued clearing at the current frequency, the risk of a failure becoming an emergency at emergency rates, and the chance that a section deteriorates past the point where lining is possible at all, which turns a reline into an excavation. We put those figures in writing so deferring stays a legitimate option, chosen with the numbers visible.
Usually, and it is most of what we line here. What rules it out is a section that has genuinely collapsed or been crushed, or one so far gone there is nothing left to form a liner against. The camera settles that before anyone quotes and the footage is handed over. If lining will not work we say so rather than selling one that fails.
A sectional patch takes hours; a full run is generally most of a working day, and you get the window in advance so it can go on the noticeboard. It goes in through existing access points, so no common area is excavated and nobody loses a courtyard for a week. In a building with no lift and shared access, that difference matters more than it does in a house.
A shared line is generally common property, so it is the owners corporation's decision and its cost, not the individual owner's who happens to have the blocked toilet. In a self-managed block that means the committee needs a written scope, a figure, staging options and the cost of doing nothing. We provide all four as part of the inspection, because a verbal opinion cannot be voted on.
A sectional patch over one failed joint is about $900 to $2,200. A full run is usually $3,500 to $7,000 depending on length, diameter and bends. A camera inspection is $250 to $450, credited against the reline if you proceed. Staged options and the cost of deferring are included in the written scope at no extra charge.
Tell us how many lots are in the scheme and whether anyone has filmed it. Both change what we prepare and what the committee will need from us.
Quoted off the footage, with staged options and the cost of waiting set out beside the full figure.
Online Now!·--:--